High Street Industrial Estate

This industrial estate required over a Kilometer of stormwater drainage to be installed. The drainage network had to be installed through some heavy basalt rock deposits which our operators smashed through. Trench depths reached 3.5m and trenching sheilds were needing to protect firstly our team members and the assets from being damaged in the event of any trench subsidence.

Previous
Previous

Dilop Drive Industrial Estate and Main Drain

Next
Next

378 Ballan Road Stages 1 & 2